Location:
|
|
Work carried out:
|
VDE No. 8.2 new railway line, Leipzig-Erfurt Osterberg Tunnel |
|
Dust-binding impregnation |
VW Wolfsburg plant |
|
Injection work |
Stuttgar 21 Los 1A Ulmer Straße |
|
Vertical injection rings and advance injection with cement and PU resin |
Stuttgart 21, lot 1B, Filder Tunnel |
|
Dam structures and injection rings |
New railway line Wendlingen-Ulm, Albabstieg (descent from the Alb hills) |
|
Dam and injection rings with cement |
New shopping centre in Kaiserslautern |
|
Gelling with acrylate gel |
BAB 100 motorway, lot 1 – Berlin |
|
Advance injections for cross-cuts with cement and microfine cement |
Metro Greenline – Doha, Qatar |
|
Top joint grouting |
Obervermunt – Austria |
|
Rock and consolidation injection / grouting of coaxial gap between armoured conduit and concrete |
Bärenwerk Power Station – Austria |
|
Sealing injection with PU resin |
Maastricht – Netherlands Tunnelmonden Europaplein |
|
Concrete repair / sealing |
Koralm Tunnel – Austria |
|
Consolidation injection / rock stabilisation to secure excavation work |
S21 S-Bahn project, Berlin |
|
Construction pit sealing |
Cross Rail – London |
|
Ground stabilisation with PU resin / tunnelling shield exit sealing work |
Joint venture for tunnel under Kö-Bogen complex – Düsseldorf |
|
Diaphragm wall sealing |
BAB 100 motorway, Berlin |
|
Anchor boring work |