Location:
|
|
Work carried out:
|
| VDE No. 8.2 new railway line, Leipzig-Erfurt Osterberg Tunnel |
|
Dust-binding impregnation |
| VW Wolfsburg plant |
|
Injection work |
| Stuttgar 21 Los 1A Ulmer Straße |
|
Vertical injection rings and advance injection with cement and PU resin |
| Stuttgart 21, lot 1B, Filder Tunnel |
|
Dam structures and injection rings |
| New railway line Wendlingen-Ulm, Albabstieg (descent from the Alb hills) |
|
Dam and injection rings with cement |
| New shopping centre in Kaiserslautern |
|
Gelling with acrylate gel |
| BAB 100 motorway, lot 1 – Berlin |
|
Advance injections for cross-cuts with cement and microfine cement |
| Metro Greenline – Doha, Qatar |
|
Top joint grouting |
| Obervermunt – Austria |
|
Rock and consolidation injection / grouting of coaxial gap between armoured conduit and concrete |
| Bärenwerk Power Station – Austria |
|
Sealing injection with PU resin |
| Maastricht – Netherlands Tunnelmonden Europaplein |
|
Concrete repair / sealing |
| Koralm Tunnel – Austria |
|
Consolidation injection / rock stabilisation to secure excavation work |
| S21 S-Bahn project, Berlin |
|
Construction pit sealing |
| Cross Rail – London |
|
Ground stabilisation with PU resin / tunnelling shield exit sealing work |
| Joint venture for tunnel under Kö-Bogen complex – Düsseldorf |
|
Diaphragm wall sealing |
| BAB 100 motorway, Berlin |
|
Anchor boring work |